Successful RFPs in Construction (Managing the Request for Proposal Process)
List Price:
$51.00
- Availability: Confirm prior to ordering
- Branding: minimum 50 pieces (add’l costs below)
- Check Freight Rates (branded products only)
Branding Options (v), Availability & Lead Times
- 1-Color Imprint: $2.00 ea.
- Promo-Page Insert: $2.50 ea. (full-color printed, single-sided page)
- Belly-Band Wrap: $2.50 ea. (full-color printed)
- Set-Up Charge: $45 per decoration
- Availability: Product availability changes daily, so please confirm your quantity is available prior to placing an order.
- Branded Products: allow 10 business days from proof approval for production. Branding options may be limited or unavailable based on product design or cover artwork.
- Unbranded Products: allow 3-5 business days for shipping. All Unbranded items receive FREE ground shipping in the US. Inquire for international shipping.
- RETURNS/CANCELLATIONS: All orders, branded or unbranded, are NON-CANCELLABLE and NON-RETURNABLE once a purchase order has been received.
Product Details
Author:
Richard Fria
Format:
Paperback
Publisher:
McGraw Hill LLC (April 8, 2005)
Audience:
General/trade
ISBN-13:
9780071449090
ISBN-10:
0071449094
Weight:
11.36oz
Dimensions:
7.2" x 8.9" x 0.52"
Case Pack:
30
File:
McGrawHill-MH_ONIX_V30_US_onix30_all(26_05_26)-20260526.xml
Folder:
McGrawHill
As low as:
$39.27
List Price:
$51.00
Publisher Identifier:
P-MCGRAW
Discount Code:
A
Pages:
172
Pub Discount:
65
Imprint:
McGraw Hill
Overview
The negotiated contract method for RFPs is a rapidly growing trend in construction. Traditionally, RFPs have gone through a competitive bid method – meaning that 100% of the design work is done without the input of contractors and with very little real cost information. With the negotiated contract method, only about 10% of the design work is done before a contractor is brought to the table, which means less paperwork and lower up-front costs. There are several advantages to the negotiated contract method:
•Because only a small part of the design work is done up-front (before a contractor is brought on board), no extensive re-design work has to be done when budget/schedule issues with the design become a factor.
•A complete team – architect/designer and contractor – is assembled earlier, making for a much more efficient process and outcome.
•The RFP process becomes a collaborative effort, rather than a competitive one.
There is no other book on the shelf that either focuses specifically on RFPs in the construction industry, or features a step-by-step method for implementing the negotiated contract method.
This is a step-by-step guide for managing the RFP process in a way that saves time, money, enhances team collaboration, and assures quality in construction. Focusing on the negotiated contract method (as opposed to the competitive bid method), the book takes readers from articulating the needs/wish list for a construction project, to the analysis of responses and interviews, through negotiations and finalization of the deal. This is a roadmap for:
•Preparing, understanding, and assessing the quality of information in an RFP.
•Gathering critical, project-specific information from free and up-to-date local databases.
•Adding value to the process by assisting consultants in marketing and project management capabilities.
•Selecting and working with a team early in the process to stay on-schedule and on-budget.
•Improving the materials selection process and the end-result overall quality of construction.
•Example and template forms make it easy to create a successful RFP process.