Remembering AEE Winfrith (A Technological Moment in Time)
List Price:
$26.95
- Availability: Confirm prior to ordering
- Branding: minimum 50 pieces (add’l costs below)
- Check Freight Rates (branded products only)
Branding Options (v), Availability & Lead Times
- 1-Color Imprint: $2.00 ea.
- Promo-Page Insert: $2.50 ea. (full-color printed, single-sided page)
- Belly-Band Wrap: $2.50 ea. (full-color printed)
- Set-Up Charge: $45 per decoration
- Availability: Product availability changes daily, so please confirm your quantity is available prior to placing an order.
- Branded Products: allow 10 business days from proof approval for production. Branding options may be limited or unavailable based on product design or cover artwork.
- Unbranded Products: allow 3-5 business days for shipping. All Unbranded items receive FREE ground shipping in the US. Inquire for international shipping.
- RETURNS/CANCELLATIONS: All orders, branded or unbranded, are NON-CANCELLABLE and NON-RETURNABLE once a purchase order has been received.
Product Details
Author:
Peter Fry
Format:
Paperback
Pages:
128
Publisher:
Amberley Publishing (November 15, 2015)
Language:
English
ISBN-13:
9781445654782
ISBN-10:
1445654784
Dimensions:
6.5" x 9.21" x 0.4"
Case Pack:
1
File:
Eloquence-IPG_05092026_P10064967_onix30-20260509.xml
Folder:
Eloquence
As low as:
$23.18
List Price:
$26.95
Publisher Identifier:
P-IPG
Discount Code:
C
Weight:
11.52oz
Audience:
General/trade
Pub Discount:
60
Imprint:
Amberley Publishing
Overview
This history of the Atomic Energy Establishment at Winfrith covers the entire timeline of the project, from its planning and inception through to the shutting down of the last reactor and the decommissioning of the site. Winfrith was one of the innovative solutions engineered to solve a nation’s growing energy concerns. With several experimental reactor designs, the installation was crucial in demonstrating the widespread viability of cheaper electricity to the British consumer, during an exciting period of nuclear advancement. For 23 years one of the chief reactors duly obliged in providing electricity to the National Grid. Another displayed how nations could unite and cooperate in the quest for scientific knowledge. Other reactors operated with less publicity but often gained plaudits in the scientific world, by inventing new computer codes or setting international standards. When Government made its decision to cut back on reactor development, Winfrith was obliged to diversify and commenced upon a new chapter as a centre for reactor safety and oil research. The book also documents Winfrith’s comprehensive training scheme for apprentices, its effect on the local economy and how plans are in place for the location’s future. Anecdotes from staff members compliment the story along with a foreword contributed by a former head of site.








