null
Loading... Please wait...
FREE SHIPPING on All Unbranded Items LEARN MORE
Print This Page

Quick Changeover Concepts Applied (Dramatically Reduce Set-Up Time and Increase Production Flexibility with SMED)

List Price: $62.99
SKU:
9781466596313
Quantity:
Minimum Purchase
25 unit(s)
  • Availability: Confirm prior to ordering
  • Branding: minimum 50 pieces (add’l costs below)
  • Check Freight Rates (branded products only)

Branding Options (v), Availability & Lead Times

  • 1-Color Imprint: $2.00 ea.
  • Promo-Page Insert: $2.50 ea. (full-color printed, single-sided page)
  • Belly-Band Wrap: $2.50 ea. (full-color printed)
  • Set-Up Charge: $45 per decoration
FULL DETAILS
  • Availability: Product availability changes daily, so please confirm your quantity is available prior to placing an order.
  • Branded Products: allow 10 business days from proof approval for production. Branding options may be limited or unavailable based on product design or cover artwork.
  • Unbranded Products: allow 3-5 business days for shipping. All Unbranded items receive FREE ground shipping in the US. Inquire for international shipping.
  • RETURNS/CANCELLATIONS: All orders, branded or unbranded, are NON-CANCELLABLE and NON-RETURNABLE once a purchase order has been received.
  • Product Details

    Author:
    Karsten Herr
    Format:
    Hardcover
    Pages:
    168
    Publisher:
    Taylor & Francis (December 10, 2013)
    Language:
    English
    ISBN-13:
    9781466596313
    Weight:
    17.625oz
    Dimensions:
    6.125" x 9.1875"
    File:
    TAYLORFRANCIS-TayFran_260326053103677-20260326.xml
    Folder:
    TAYLORFRANCIS
    List Price:
    $62.99
    Case Pack:
    25
    As low as:
    $59.84
    Publisher Identifier:
    P-CRC
    Discount Code:
    H
    Pub Discount:
    30
    Audience:
    Professional and scholarly
    Country of Origin:
    United States
    Imprint:
    Productivity Press
  • Overview

    Shifting from external to internal set-up steps and optimizing your set-up procedure is only the first step in achieving world-class performance. What’s most important is what comes next, cutting down internal set-up times and achieving changeovers that last only a few minutes.

    Quick Changeover Concepts Applied: Dramatically Reduce Set-Up Time and Increase Production Flexibility with SMED provides a comprehensive overview of changeovers from a strategic, tactical, and operational perspective. It outlines specific strategies that can help readers shorten internal set-up steps through the physical analysis of machine elements. The method presented is the result of a synthesis of Shigeo Shingo’s classic single-minute exchange of die (SMED) methodology with modern engineering techniques.

    Providing readers with the understanding required to significantly reduce internal set-up times, the book explains why efficient changeovers are critical to production scheduling. It redefines set-up and set-up time and details a step-by-step method for developing quick changeover methods in a manner where changes can be realized with minimal spending. Properly implemented, the quick changeover concepts presented, can help you reduce set-up times by up to 95 percent.

    The book uses language that is easy to understand to make it accessible to all functions along the value stream—from shop floor operators and industrial engineers to machine designers. It introduces the concept of systems engineering, explains the set-up process and its various elements, and addresses the financial aspects of set-up.

    Maintaining an analytical focus, the text describes the theoretical details and includes numerous application examples for every step. It also includes an extensive chapter on fasteners and connection material that presents alternative methods to connect elements that can save you valuable time.