null
Loading... Please wait...
FREE SHIPPING on All Unbranded Items LEARN MORE
Print This Page

NEC4: Effective Preparation and Management of the Construction Programme

List Price: $74.00
SKU:
9781836624813
Quantity:
Minimum Purchase
25 unit(s)
  • Availability: Confirm prior to ordering
  • Branding: minimum 50 pieces (add’l costs below)
  • Check Freight Rates (branded products only)

Branding Options (v), Availability & Lead Times

  • 1-Color Imprint: $2.00 ea.
  • Promo-Page Insert: $2.50 ea. (full-color printed, single-sided page)
  • Belly-Band Wrap: $2.50 ea. (full-color printed)
  • Set-Up Charge: $45 per decoration
FULL DETAILS
  • Availability: Product availability changes daily, so please confirm your quantity is available prior to placing an order.
  • Branded Products: allow 10 business days from proof approval for production. Branding options may be limited or unavailable based on product design or cover artwork.
  • Unbranded Products: allow 3-5 business days for shipping. All Unbranded items receive FREE ground shipping in the US. Inquire for international shipping.
  • RETURNS/CANCELLATIONS: All orders, branded or unbranded, are NON-CANCELLABLE and NON-RETURNABLE once a purchase order has been received.
  • Product Details

    Author:
    Tim Willis
    Format:
    Paperback
    Pages:
    140
    Publisher:
    Emerald Publishing Limited (February 14, 2025)
    Language:
    English
    Audience:
    Professional and scholarly
    ISBN-13:
    9781836624813
    ISBN-10:
    1836624816
    Dimensions:
    6.73" x 9.76" x 0.3"
    File:
    TWO RIVERS-PERSEUS-Metadata_Only_Perseus_Distribution_Customer_Group_Metadata_20251129163309-20251129.xml
    Folder:
    TWO RIVERS
    List Price:
    $74.00
    Country of Origin:
    United Kingdom
    Pub Discount:
    35
    Case Pack:
    1
    As low as:
    $70.30
    Publisher Identifier:
    P-PER
    Discount Code:
    H
    Weight:
    8.48oz
    Imprint:
    ICE Publishing
  • Overview

    NEC4: Effective Preparation and Management of the Construction Programme explains the critical role of the programme within the NEC4 suite of contracts, providing insight and guidance into NEC4 contract requirements and good practice in the preparation of planning the works and the programme.

    The book describes the vital role of the Accepted Programme, both as a contract document, and also as a fundamental tool in contractual procedures, such as its use in assessing changes to planned completion in close to real time, and its use in risk allocation. It includes coverage of key roles of the Client, Contractor and Project Manager in preparing, updating and using the Accepted Programme, and together the chapters provide a sound basis for those preparing and administering the programme in the NEC4 Engineering and Construction Contract (ECC). It is also relevant to users of the NEC4 Professional Services Contract (PSC), the NEC4 Term Service Contract (TSC), and the less onerous programming for the ECC short form.

    NEC4: Effective Preparation and Management of the Construction Programme is an essential guide for anyone involved with NEC projects to help them understand the importance of properly managing the contract programme, including professionals involved in preparing an NEC contract, Project Managers who administer the programme, and contractors who must prepare and update them.