Margam Depot
List Price:
$25.95
- Availability: Confirm prior to ordering
- Branding: minimum 50 pieces (add’l costs below)
- Check Freight Rates (branded products only)
Branding Options (v), Availability & Lead Times
- 1-Color Imprint: $2.00 ea.
- Promo-Page Insert: $2.50 ea. (full-color printed, single-sided page)
- Belly-Band Wrap: $2.50 ea. (full-color printed)
- Set-Up Charge: $45 per decoration
- Availability: Product availability changes daily, so please confirm your quantity is available prior to placing an order.
- Branded Products: allow 10 business days from proof approval for production. Branding options may be limited or unavailable based on product design or cover artwork.
- Unbranded Products: allow 3-5 business days for shipping. All Unbranded items receive FREE ground shipping in the US. Inquire for international shipping.
- RETURNS/CANCELLATIONS: All orders, branded or unbranded, are NON-CANCELLABLE and NON-RETURNABLE once a purchase order has been received.
Product Details
Author:
Martin Bray, Martin Bray
Format:
Paperback
Pages:
96
Publisher:
Amberley Publishing (November 15, 2021)
Language:
English
ISBN-13:
9781398103726
ISBN-10:
1398103721
Weight:
12oz
Dimensions:
165" x 234" x 0.3"
File:
Eloquence-IPG_05162026_P10097361_onix30-20260516.xml
Folder:
Eloquence
List Price:
$25.95
Case Pack:
1
As low as:
$22.32
Publisher Identifier:
P-IPG
Discount Code:
C
Audience:
General/trade
Pub Discount:
60
Imprint:
Amberley Publishing
Overview
Margam Servicing Depot was built on a landfill site and opened during March 1964. Its function was to service locomotives operating to and from Margam Knuckle Yard, which was acclaimed as being the most highly mechanised in the United Kingdom when it was opened in 1960. One of Margam’s iconic freight trains was the Port Talbot Docks to Llanwern Steel Works iron ore train. When it commenced running in March 1976, it was acclaimed as being one of the heaviest freight trains running in the United Kingdom. When Canton Traction Maintenance Depot closed in May 2004 many of its skilled staff transferred to Margam Servicing Depot together with some of its maintenance work. As a result of this, an extension was built onto the existing depot and equipped with a 2.5-ton overhead crane.Margam Servicing Depot eventually closed on 1 August 2009. Here, Martin Bray offers a wonderful photographic tribute to an important chapter in the story of the rail scene of South Wales.








