null
Loading... Please wait...
FREE SHIPPING on All Unbranded Items LEARN MORE
Print This Page

Integrated Reservoir Studies

List Price: $114.00
SKU:
9782710807971
Quantity:
  • Availability: Confirm prior to ordering
  • Branding: minimum 50 pieces (add’l costs below)
  • Check Freight Rates (branded products only)

Branding Options (v), Availability & Lead Times

  • 1-Color Imprint: $2.00 ea.
  • Promo-Page Insert: $2.50 ea. (full-color printed, single-sided page)
  • Belly-Band Wrap: $2.50 ea. (full-color printed)
  • Set-Up Charge: $45 per decoration
FULL DETAILS
  • Availability: Product availability changes daily, so please confirm your quantity is available prior to placing an order.
  • Branded Products: allow 10 business days from proof approval for production. Branding options may be limited or unavailable based on product design or cover artwork.
  • Unbranded Products: allow 3-5 business days for shipping. All Unbranded items receive FREE ground shipping in the US. Inquire for international shipping.
  • RETURNS/CANCELLATIONS: All orders, branded or unbranded, are NON-CANCELLABLE and NON-RETURNABLE once a purchase order has been received.
  • Product Details

    Author:
    Luca Cosentino
    Format:
    Paperback
    Pages:
    310
    Publisher:
    Editions Technip (March 9, 2001)
    Language:
    English
    ISBN-13:
    9782710807971
    ISBN-10:
    2710807971
    Weight:
    28oz
    Dimensions:
    7" x 9.75"
    File:
    ATLAS-BTPS_05282021-20210528.xml
    Folder:
    ATLAS
    As low as:
    $87.78
    Publisher Identifier:
    P-BTPS
    Discount Code:
    A
    List Price:
    $114.00
    Pub Discount:
    65
  • Overview

    Contents: 1. Integration issues: What is integration? Systems thinking. A Change of focus. Integrating the information. Accuracy vs. precision. Complexity vs. accuracy. Other integration issues. The role of the project manager. 2. The integrated database: Definitions. The problem of the integrated database. The three levels of E&P databases. The project database. Project database management. Software integration. 3. Integrated geological model: The structural model. The stratigraphic model. The lithological model. Reservoir heterogeneity. 4. Rock properties: Petrophysical evaluation. Rock properties distribution. 5. Hydrocarbon in place determination: Volumetric estimates. Material balance estimates. 6. Basic reservoir engineering: Reservoir natural drive mechanisms. Fluid properties. Rock-fluid properties. Pressure analysis. Reservoir fluids distribution and monitoring. Material balance. Streamlines simulation. 7. Numerical reservoir simulation: When to run a simulation model? Why run a simulation model? Designing the simulation model. Building the simulation grid. Assigning the input parameters. History matching. Production forecasts. Uncertainty assessment. 8. Planning a study: Planning vs. integration. Estimation of individual work phases. Sequential planning. Integrated planning. Conclusions. References. Appendix. Index.