- Home
- Business & Economics
- Industries
- Gaslights to Gigawatts (A Human History of BC Hydro and Its Predecessors, Updated)
Gaslights to Gigawatts (A Human History of BC Hydro and Its Predecessors, Updated)
List Price:
$50.00
| Expected release date is Aug 1st 2026 |
- Availability: Confirm prior to ordering
- Branding: minimum 50 pieces (add’l costs below)
- Check Freight Rates (branded products only)
Branding Options (v), Availability & Lead Times
- 1-Color Imprint: $2.00 ea.
- Promo-Page Insert: $2.50 ea. (full-color printed, single-sided page)
- Belly-Band Wrap: $2.50 ea. (full-color printed)
- Set-Up Charge: $45 per decoration
- Availability: Product availability changes daily, so please confirm your quantity is available prior to placing an order.
- Branded Products: allow 10 business days from proof approval for production. Branding options may be limited or unavailable based on product design or cover artwork.
- Unbranded Products: allow 3-5 business days for shipping. All Unbranded items receive FREE ground shipping in the US. Inquire for international shipping.
- RETURNS/CANCELLATIONS: All orders, branded or unbranded, are NON-CANCELLABLE and NON-RETURNABLE once a purchase order has been received.
Product Details
Author:
Hugh Wilson, BC Hydro Power Pioneers
Format:
Hardcover
Pages:
392
Publisher:
Figure 1 Publishing (August 1, 2026)
Imprint:
Figure 1 Publishing
Release Date:
August 1, 2026
Language:
English
Audience:
General/trade
ISBN-13:
9781773272443
ISBN-10:
1773272446
Weight:
18oz
Dimensions:
9" x 11" x 1.2"
File:
PGW-LEGATO-Metadata_Only_Publishers_Group_West_Customer_Group_Metadata_20260311164723-20260311.xml
Folder:
PGW
List Price:
$50.00
Country of Origin:
Canada
Pub Discount:
65
Series:
BC Hydro
Case Pack:
10
As low as:
$38.50
Publisher Identifier:
P-PER
Discount Code:
A
Overview
Newly revised and redesigned, this is the human history of the company that powered the development of the electric system in British Columbia—and in turn played an integral role in shaping the province.
“A utility is a thing with a heartbeat—a steady beat of progress brought about not by water and wire, turbines and transformers, but by all the people who put our resources and equipment to the benefit of all.”—Sam Weston of the BC Power Commission
From its earliest days in colonial Victoria to the initiation of the massive Site C power project in 2015, BC Hydro and its predecessor companies have played a central role in the history of British Columbia. Told through the voices of its employees over three different centuries, Gaslights to Gigawatts recounts the story of the people and projects that delivered power–and much more–to the citizens of the province. It opens in an era when the gas street lamps were lit by hand each evening, covers the decades when the company offered a remarkable array of services to more and more of the province, and finishes in a century when advanced technologies and societal expectations have dramatically altered the way power is delivered to British Columbians.
First published in 1998, Gaslights to Gigawatts was a BC Bestseller. This edition brings the story up to date with new interviews and a contemporary design, and includes more than 200 black-and-white and full-colour archival photographs and illustrations, a glossary, chronology, and index.
Proceeds from the sale of this book go to the BC Hydro Power Pioneers Miracle Millions Campaign for BC Children’s Hospital.
“A utility is a thing with a heartbeat—a steady beat of progress brought about not by water and wire, turbines and transformers, but by all the people who put our resources and equipment to the benefit of all.”—Sam Weston of the BC Power Commission
From its earliest days in colonial Victoria to the initiation of the massive Site C power project in 2015, BC Hydro and its predecessor companies have played a central role in the history of British Columbia. Told through the voices of its employees over three different centuries, Gaslights to Gigawatts recounts the story of the people and projects that delivered power–and much more–to the citizens of the province. It opens in an era when the gas street lamps were lit by hand each evening, covers the decades when the company offered a remarkable array of services to more and more of the province, and finishes in a century when advanced technologies and societal expectations have dramatically altered the way power is delivered to British Columbians.
First published in 1998, Gaslights to Gigawatts was a BC Bestseller. This edition brings the story up to date with new interviews and a contemporary design, and includes more than 200 black-and-white and full-colour archival photographs and illustrations, a glossary, chronology, and index.
Proceeds from the sale of this book go to the BC Hydro Power Pioneers Miracle Millions Campaign for BC Children’s Hospital.









