- Home
- Business & Economics
- Industries
- Financing of Private Hydropower Projects
Financing of Private Hydropower Projects
List Price:
$22.00
- Availability: Confirm prior to ordering
- Branding: minimum 50 pieces (add’l costs below)
- Check Freight Rates (branded products only)
Branding Options (v), Availability & Lead Times
- 1-Color Imprint: $2.00 ea.
- Promo-Page Insert: $2.50 ea. (full-color printed, single-sided page)
- Belly-Band Wrap: $2.50 ea. (full-color printed)
- Set-Up Charge: $45 per decoration
- Availability: Product availability changes daily, so please confirm your quantity is available prior to placing an order.
- Branded Products: allow 10 business days from proof approval for production. Branding options may be limited or unavailable based on product design or cover artwork.
- Unbranded Products: allow 3-5 business days for shipping. All Unbranded items receive FREE ground shipping in the US. Inquire for international shipping.
- RETURNS/CANCELLATIONS: All orders, branded or unbranded, are NON-CANCELLABLE and NON-RETURNABLE once a purchase order has been received.
Product Details
Author:
Chris Head
Format:
Paperback
Pages:
136
Publisher:
The World Bank (July 1, 2000)
Language:
English
Audience:
Professional and scholarly
ISBN-13:
9780821347997
ISBN-10:
0821347993
Dimensions:
8.375" x 10.75"
File:
Eloquence-IPG_07022026_P10280930_onix30_Complete-20260702.xml
Folder:
Eloquence
List Price:
$22.00
Series:
World Bank Discussion Papers
As low as:
$20.90
Publisher Identifier:
P-IPG
Discount Code:
H
Pub Discount:
32
Imprint:
World Bank Publications
Weight:
12oz
Overview
Concerns about global warming and the availability of clean renewable sources of energy are increasing. However, as private companies take over state power utilities, the demand for profit has stifled those concerns. Currently the private sector is building over 40 megawatts of fossil-fuel thermal plants for each new megawatt of hydropower.
This report examines the reasons for building fewer hydropower plants and looks at ways to eliminate some of the drawbacks. It studies ten privately financed hydro schemes, which represent all but the smaller projects likely to be considered for private financing in the future. The projects are located in five countries where the power sector is at different stages of maturity and deregulation. They include multi- and single-purpose projects intended for both domestic supply and export.








