- Home
- Technology & Engineering
- Construction
- Collaborative Design Management
Collaborative Design Management
- Availability: Confirm prior to ordering
- Branding: minimum 50 pieces (add’l costs below)
- Check Freight Rates (branded products only)
Branding Options (v), Availability & Lead Times
- 1-Color Imprint: $2.00 ea.
- Promo-Page Insert: $2.50 ea. (full-color printed, single-sided page)
- Belly-Band Wrap: $2.50 ea. (full-color printed)
- Set-Up Charge: $45 per decoration
- Availability: Product availability changes daily, so please confirm your quantity is available prior to placing an order.
- Branded Products: allow 10 business days from proof approval for production. Branding options may be limited or unavailable based on product design or cover artwork.
- Unbranded Products: allow 3-5 business days for shipping. All Unbranded items receive FREE ground shipping in the US. Inquire for international shipping.
- RETURNS/CANCELLATIONS: All orders, branded or unbranded, are NON-CANCELLABLE and NON-RETURNABLE once a purchase order has been received.
Product Details
Overview
The design process has always been central to construction, but recent years have seen its significance increase, and the ways of approaching it multiply. To an increasing degree, other stakeholders such as contractors have input at the design stage, and the designer’s role includes tasks that were traditionally the realm of other professions.
This presents challenges as well as opportunities, and both are introduced, discussed, and analysed in Collaborative Design Management. Case studies from the likes of ARUP, Buro Happold, VINCI Construction UK Ltd, and CIOB show how technologies (BIM, podcasting), innovative working (information management, collaboration), and the evolution of roles (the designer-contractor interface, environmental compliance) have changed design management as a process.
Starting from a basic level, the reader is introduced to the key themes and background to the design management role, including definitions of the responsibilities now commonly involved, and the strategic importance of design. Influential technologies currently in use are evaluated, and the importance they are likely to have in future is explored.
This combination of case studies from leading practitioners, clear explanations of design management roles and activities, and an exploration of how to succesfully achieve collaborative design management makes this a highly topical and uniquely valuable book. This is essential reading for professionals and students of all levels interested in construction design management, from all AEC backgrounds.








