- Home
- Architecture
- History
- Basics Construction Scheduling
Basics Construction Scheduling
- Availability: Confirm prior to ordering
- Branding: minimum 50 pieces (add’l costs below)
- Check Freight Rates (branded products only)
Branding Options (v), Availability & Lead Times
- 1-Color Imprint: $2.00 ea.
- Promo-Page Insert: $2.50 ea. (full-color printed, single-sided page)
- Belly-Band Wrap: $2.50 ea. (full-color printed)
- Set-Up Charge: $45 per decoration
- Availability: Product availability changes daily, so please confirm your quantity is available prior to placing an order.
- Branded Products: allow 10 business days from proof approval for production. Branding options may be limited or unavailable based on product design or cover artwork.
- Unbranded Products: allow 3-5 business days for shipping. All Unbranded items receive FREE ground shipping in the US. Inquire for international shipping.
- RETURNS/CANCELLATIONS: All orders, branded or unbranded, are NON-CANCELLABLE and NON-RETURNABLE once a purchase order has been received.
Product Details
Overview
Aufgrund von engen Zeitvorgaben und stark vernetzten Abläufen im Planungs- und Bauprozess ist die Terminplanung eine wichtige Voraussetzung für die erfolgreiche Projektdurchführung. Architekten sind in der Pflicht, alle Beteiligten zielorientiert zu steuern und deren Leistungen zum richtigen Zeitpunkt abzurufen. Dabei ist eine konsequente und an die Arbeitsabläufe angepasste Planung der Termine ein notwendiges Arbeitsinstrument, um in der täglichen Arbeit die Komplexität eines Bauprojektes steuern und überwachen zu können.
Themen:
- Organisation des Planungs- und Bauablauf
- Grundlagen der Terminplanung
- Zweckorientierte Darstellungsarten und -tiefen
- Aufstellen eines Terminplans
- Nutzung von Terminplänen in der Praxis








