- Home
- Technology & Engineering
- Civil
- A Practical Guide to Construction of Hydropower Facilities
A Practical Guide to Construction of Hydropower Facilities
- Availability: Confirm prior to ordering
- Branding: minimum 50 pieces (add’l costs below)
- Check Freight Rates (branded products only)
Branding Options (v), Availability & Lead Times
- 1-Color Imprint: $2.00 ea.
- Promo-Page Insert: $2.50 ea. (full-color printed, single-sided page)
- Belly-Band Wrap: $2.50 ea. (full-color printed)
- Set-Up Charge: $45 per decoration
- Availability: Product availability changes daily, so please confirm your quantity is available prior to placing an order.
- Branded Products: allow 10 business days from proof approval for production. Branding options may be limited or unavailable based on product design or cover artwork.
- Unbranded Products: allow 3-5 business days for shipping. All Unbranded items receive FREE ground shipping in the US. Inquire for international shipping.
- RETURNS/CANCELLATIONS: All orders, branded or unbranded, are NON-CANCELLABLE and NON-RETURNABLE once a purchase order has been received.
Product Details
Overview
This book deals with the narratives of water to watt, which includes elementary conceptual design, modern planning, scheduling and monitoring systems, and extensive pre- and post-investigations pertaining to hydropower facilities. It also includes explorations to ensure aspects of dam safety evaluation, effective contract management, specialized construction management techniques, and preferred material and equipment handling systems. Special emphasis is placed upon health, safety, environmental, and risk management concepts. The book discusses a standard QA/QC system to measure and assure quality and an environmental impact assessment to reach the set target in the stipulated timeline within the approved budget.
Key Features:








